How Driva reduced grid demand by 10% using ChargeSim

Walk through Driva’s electrification project, highlighting the practical challenges of scaling to 130 buses and how ChargeSim was used to test charging strategies and depot designs. You will learn where traditional planning fell short, what the data revealed, and the design choices that ultimately reduced grid demand by 10%.

This is not intended as financial or technical advice and ChargeSim accepts no liability for actions taken based on it. Always consult a professional about your specific situation.